From tank supply and underground installation to monitoring systems, aboveground builds, and environmental compliance — Stealth Tanks handles the complete project lifecycle across fuel retail, aviation, fleet, industrial, and water sectors.
We stock 32,000 and 40,000-gallon double-wall underground storage tanks in Greater Houston — ready to ship within days. Built by a manufacturer with 75 years in the business. While the industry averages 4–6 month lead times, your tank is already built.
Double-wall UST — steel primary with corrosion-proof HDPE jacket
UST excavation and placement process
We handle the full underground tank installation — excavation coordination, tank placement, backfill, cathodic protection, and commissioning. Critically, we manage your Texas TCEQ (Texas Commission on Environmental Quality) UST registration so you're compliant before your first gallon flows. No surprises, no fines.
Installation of Gilbarco Veeder-Root and Wayne Ovation fuel dispensers — the two leading pump brands in the US market. We handle single-hose, dual-hose, and high-volume configurations for gas stations, truck stops, and fleet fueling facilities. Every installation is calibrated, inspected, and commissioned before handoff.
Completed forecourt — canopy, dispensers, and signage
UST delivery and placement at active construction site
Fuel canopy structure fabrication, installation, and branding fascia. We work with all major fuel brands and private-label designs to deliver a complete, professional forecourt. From site prep to LED canopy lighting to final punch list — we own the entire construction scope so you don't have to juggle contractors.
Every piece of a fuel station build — and every adjacent storage need — handled by one company.
Complete underground fuel piping systems from tank to dispenser. Primary product lines, vapor recovery, secondary containment, and sump installations.
Street-facing LED fuel price sign supply and installation. Single-sided, double-sided, and multi-grade configurations for maximum visibility and local compliance.
Proper removal and decommissioning of old underground storage tanks. closure documentation, soil sampling, and disposal — required for property sale or redevelopment.
Automatic tank gauging (ATG) system installation and calibration. Real-time inventory tracking, leak detection alerts, and remote monitoring for single sites and multi-site operators.
Installation of aboveground storage tanks for fleet fueling yards, aviation, agriculture, and industrial applications. Includes foundation design, secondary containment berm construction, and piping connections.
Regulatory compliance guidance for new tank installations, active UST systems, and pre-purchase site assessments. We know what TCEQ wants and we'll help you deliver it.
Most projects go from first call to in-ground installation in under 30 days.
Call or fill out our form. We respond within 2 hours with tank availability and pricing.
We hold your specific tank with a deposit. It's off the market — no one else can take it.
We coordinate delivery to your jobsite or manage the full excavation and installation crew.
Tank goes in the ground. Cathodic protection, leak detection, and piping connections made.
We submit your TCEQ registration, complete startup testing, and hand you the keys. You're open.
One call covers everything. We respond within 2 hours with pricing and availability.